Edward Jones Data Center – Tempe, AZ [2000-2002]
Design of N+1 electrical redundant system. Stand-by paralleling system for support of redundant cooling plant. Design of electrical infrastructure to support data center and office space functions. Design of remote Satellite Building facility.

Edward Jones Data Center – Maryland Heights, MO [2000-2002]
Design of electrical redundant system. Stand-by paralleling system for support of redundant cooling plant. Design of electrical infrastructure to support data center and office space functions.

Edward Jones 201 Progress Parkway Data Center Expansion, Maryland Heights, MO [2000-2002]
Design of N+1 electrical redundant system. Stand-by paralleling system for support of cooling plant. Design of electrical infrastructure to support data center and office space functions. Design of electrical infrastructure to support additional critical data processing and mechanical loads; a 1000KW stand-by generator set was also included.

Edward Jones 201 Progress Parkway New 500 KVA UPS Maryland Heights, MO [2000-2002]
Design of new 500KVA UPS to support additional critical loads in existing Data Center; design also included provisions for two (2) roof-mounted air- cooled chillers.

Sun Microsystems Campus Phase I – Interlocken, CO [1998-2000]
Power and Data/Communications raceway system design to serve four (4) campus office buildings with four (4) 3200A switchgear line-ups included.

General American – St. Louis, MO [1995-1998]
Remodel 1st and 6th floors at headquarters. Power, lighting, fire protection, data/communication raceway system.


General American Insurance – St. Louis, MO [1995-1998]
Complete stand-by power back-up system for their computer room. 1000KW genset with UPS provisions.