commercial
MC Sports 30,000 sq.ft. Store – Warrensburg, MO [2016]
Complete MEP documents including Air Handling Units, pumps, heaters, lighting, building/site lighting, power, small power, fire alarm, CCTV, PA system, Access Control Systems and POS systems based on Owner prototype design to accommodate for specific site.
AMDOCS Renovations – Chesterfield, MO [2014]
MEP construction documents for this significant existing office space separation; Owner’s direction included turning over approximately 10,000 sq.ft. of office space back to landlord. Electrical lighting, power, systems, fire alarm and mechanical ducting systems required treatment.
St Louis Component Parts – Chesterfield, MO [2014]
MEP construction documents for light testing of aircraft parts. Facility is regularly checked by the FAA for standards compliance. Lighting, power and mechanical modifications to an existing space for tenant fit out.
Alaska Airlines St Louis Rollout at Lambert St Louis International Airport – St. Louis, MO [2006-2013]
Complete provision of a voice and data cabling infrastructure system at a new ticket counter, back office operations, ramp operations, gate and cargo areas for new airline service at Lambert airport. Tasks also included close coordination with telephone and internet providers in anticipation of this airlines first flight.
Monsanto Baur Warehouse Upgrade – Creve Coeur, MO [2006-2013]
Lighting, power, fire alarm, exterior egress lighting design plus voice/data provisions for a new office space within an existing warehouse environment.
The Shoppes at Questover (24 units), Creve Coeur, MO [2000-2006]
Developed the Electrical Design criteria for the Owner; the criteria defines the expected standard of quality for the material and installation of the lighting [site and interior] and power [site and interior] systems.
Gravois Springs Commercial Center (15 units), House Springs, MO [2000-2006]
Developed Electrical Design drawings which included circuiting serving: site, building and interior lighting; wiring devices; mechanical equipment; electrical distribution equipment including the service entrances. Coordinated with the electric utility and provided an empty raceway system for the prospective campus-type primary cabling layout. Coordinated with the telephone and cable companies for empty raceway requirements.